İzmir Havaalanı Trigen Binası September 2013

Ali trim works of Trigen Building has completed in izmir Airport

Place: Gaziemir / İzmir Area: 950 m²
Türkerler Holding Jeotermal Santral August 2013

Ali concrete works of 24 KW Geotermal Energy Plant in Manisa Alaşehir, Türkerler Holding is the investor and contract type is a turnkey project.

Place: Alaşehir / Manisa Area: 12000 m²
Meta A.ş. Trafo Binaları August 2013

Construction of transformer buildings of META company of Zorlu Holding

Place: Gördes / Manisa Area: 6000 m²
Yıldız Entegre Tesisleri January 2012

Ali concrete works and 150.000 m2 concrete road work ofthefactory YILDIZ ENTEGRE.

Place: Akhisar / Manisa Area: 80000 m²
Keskinoğlu Sevkiyat Ambarı November 2010

Prefabricated structure having 1400 m2 area.

Place: Akhisar / Manisa Area: 14000 m²
Abp Fabrika June 2010

A Renovation project and work of the factory ABP in AOSB

Place: Akhisar / Manisa Area: 300 m²
Alhatoğlu Zeytinyağ Tesisi December 2009

Constructed in a land of 6000 m2 at AOSB, the modern structure has designed considering the comfort and functional needs of the client.